[BLAST_SHIFTS] Shift summary 12/06/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Dec 06 2004 - 09:12:05 EST


Operator: karpiusp

Smooth shift of H2-ABS until it was noticed that the 6pole pressure strip charts were going off scale. Called EI and shut V11,V14 to run empty

H2-ABS: 13090-13094
EMPTY: 13095



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST