[BLAST_SHIFTS] Shift summary 03/02/2005 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Mar 03 2005 - 09:19:57 EST


Operator: karpiusp

Smooth shift many ABS-D2 runs taken at 250K ea.
Kept an eye on V12 and V13 - these were "IN" at each inspection.

Ligit stable, and only 1-2 WC trips all shift



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST