[BLAST_SHIFTS] Shift summary 03/25/2005 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Mar 25 2005 - 17:21:07 EST


Operator: akdogan

We took empty target data during this shift. HV trips at one point were
too frequent such that I had to turn them of ffor 15minutes, then decreased
the HVs for L21 and R24.

Currently they are at 3825V and holding fine.

ABS was setup recently. Genya is still working on the ABS settings. We
should be able to resume ABS-D2 data shortly.

Otherwise, it was a smooth shift.

The Charge-per-Hour meter hit 512 C/h.

The latest crunched data shows the following hPz
L: 0.458 +- 0.059
R: 0.324 +- 0.039



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST