Operator: seely
smooth shift. South Hall was open until 10 while the turbo pump controller was replaced.
good runs crunching: 14980,14981, 14984-14986
note that runs 14981,14984,14985 are missing some channels (LTOF13) and some LADs channels (detailed in elog entry). this was due to the HV being turned off after a trip (CE was set to 0 instead of 1).
pol log not updated yet since previous shift's runs still crunching.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST