[BLAST_SHIFTS] Daily BLAST meeting

From: Taylan Akdogan (akdogan@MIT.EDU)
Date: Tue Apr 12 2005 - 15:22:15 EDT


Run plan for this evening:

- Continue to take ABS-D2 until midnight or the nozzle clogs,
  whichever comes first.

- Switch to empty target, thereafter. (Genya will coordinate
  this.)

- Open the hall at 7am for maintenance. Keep the ring secured
  for another 20 minutes.

- Bill Franklin and Taylan will measure the P_circ of the Compton
  laser between 7:00-7:20am while the ring is secured, then open
  the rest of the facility for the maintenance.

- Unpol system will be used for calibration during the day.

-- o --

Pay attention to the log files: pol.log, RUNLIST-D2.4, and keep
track of the crunching.

Note that auto-cruncher is reporting the runs as crashed. This is
most of the time NOT correct. Check the output file (see elog for
details) before re-submitting the runs.

Taylan

-- 
---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=---
Taylan Akdogan              Massachusetts Institute of Technology
akdogan@mit.edu                             Department of Physics
Phn:+1-617-258-0801                Laboratory for Nuclear Science
Fax:+1-617-258-5440                                   Room 26-559
---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=---



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST