Run plan for this evening:
- Continue to take ABS-D2 until midnight or the nozzle clogs,
whichever comes first.
- Switch to empty target, thereafter. (Genya will coordinate
this.)
- Open the hall at 7am for maintenance. Keep the ring secured
for another 20 minutes.
- Bill Franklin and Taylan will measure the P_circ of the Compton
laser between 7:00-7:20am while the ring is secured, then open
the rest of the facility for the maintenance.
- Unpol system will be used for calibration during the day.
-- o --
Pay attention to the log files: pol.log, RUNLIST-D2.4, and keep
track of the crunching.
Note that auto-cruncher is reporting the runs as crashed. This is
most of the time NOT correct. Check the output file (see elog for
details) before re-submitting the runs.
Taylan
-- ---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=--- Taylan Akdogan Massachusetts Institute of Technology akdogan@mit.edu Department of Physics Phn:+1-617-258-0801 Laboratory for Nuclear Science Fax:+1-617-258-5440 Room 26-559 ---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=---