[BLAST_SHIFTS] Shift summary 04/26/2005 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Apr 26 2005 - 16:48:31 EDT


Operator: vziskin

D2 data taking continued. No problems to report. No hvGui problems. Did the Dtunnel cool down? CCR adjusted the tune a little bit to improve the BQMs.
Runs taken: 15610-15611 15613-15618 15620 15622-15624. No polarization results yet.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST