Operator: egeis
Genya was tuning ABS when I arrived... ABS was running at approximately 2:00. SFT probe was working well with current. There was difficulty filling to 225. So we're filling to 215. Data taking began at ~4:00. One broken pipe to the HV. One transmitter 1 crowbar.
Runs of ABS: 15781-15784