[BLAST_SHIFTS] Summary B and C shift Friday 2005/5/6

From: Michael Kohl (kohlm@mit.edu)
Date: Sat May 07 2005 - 01:19:25 EDT


The shifts summary form still does not work, so I'm posting manually to
blast_shifts.

The reading of the new hall probe of the SFT is not reproduceable. A
wiring issue is suspected.

We've been running polarized deuterium with ABS since 1pm. The SFT unit
is operated based on current readout only (see message from daily
meeting). So far (after 12 hours), no failure has been noticed.

Took polarized deuterium runs 15798 15800-15804 15805-15811. Runs
15801-15804 15806 are 500k runs to speed up polarization analysis. No
results yet, all runs are crunching.

Following shifts people please note message from daily meeting today with
the run plan.

Regards,

  Michael

-- 

+-------------------------------------+--------------------------+ | Office: | Home: | |-------------------------------------|--------------------------| | Dr. Michael Kohl | Michael Kohl | | Laboratory for Nuclear Science | 5 Ibbetson Street | | MIT-Bates Linear Accelerator Center | Somerville, MA 02143 | | Middleton, MA 01949 | U.S.A. | | U.S.A. | | | - - - - - - - - - - - - | - - - - - - - - -| | Email: kohlm@mit.edu | K.Michael.Kohl@gmx.de | | Work: +1-617-253-9207 | Home: +1-617-629-3147 | | Fax: +1-617-253-9599 | Mobile: +1-978-580-4190 | | http://blast.lns.mit.edu | | +-------------------------------------+--------------------------+



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST