Monday B shift 9-5 Operator : Manouch

Smooth running until 3:00 pm. at 3:30 an access made to replace D2
bottles. Also realized that ABS nozzle is clogging. turned ABS off for
regeneration. CCR will tune beam to improve beam and to get to 225 mA
max injection.

While nozzle regen. in progress and until ABS is back (perhaps Tuesday
morning) will run unpol. D2 and/or empty. M. Kohl is working w/ aki over
the phone to set up the unpol. system.

good runs: 15871-15874