Running again on ABS deuterium after nozzle and cryo
regeneration. Solenoids have been filled. Ring filling to 225 mA,
lifetimes 25-26 minutes. Continue running this way. Watch compression
tube traces to be sure transitions are correct. Keep pol.log and
RUNLIST-D2 up to date.
Bill tried adjusting the Compton to get a smaller false asymmetry. Not
much luck.
Karen
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST