[BLAST_SHIFTS] Sift Summary 19/5/2005 - A

From: Douglas Hasell (hasell@MIT.EDU)
Date: Thu May 19 2005 - 08:25:28 EDT


Running on polarised D.

Generally easy running except for repeated problems with the
longitudinal holding field switching off because of a water
interlock. First occurred around 2:30 and had to end run 16123 after
only 186K events. Then happened again at 6:00, 6:30, and 7:30. Each
time ended run early and it was necessary to make a controlled access
to the south hall floor to reset the flow interlock. After fourth
occurrence phoned technicians to come and investigate cause of problem.

Currently waiting of repairs.

Runs 16123-16128 16130 taken and crunching.
  