Running on polarised D.
Generally easy running except for repeated problems with the
longitudinal holding field switching off because of a water
interlock. First occurred around 2:30 and had to end run 16123 after
only 186K events. Then happened again at 6:00, 6:30, and 7:30. Each
time ended run early and it was necessary to make a controlled access
to the south hall floor to reset the flow interlock. After fourth
occurrence phoned technicians to come and investigate cause of problem.
Currently waiting of repairs.
Runs 16123-16128 16130 taken and crunching.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST