I just learned today that the power in the Research Building will be shut
off most of tomorrow for maintenance on Switchgear 3. This will affect the
BLAST farm.
I will be scheduling all the BLAST computers, as well as BLAST05 and
BLAST02, to shutdown at 6AM tomorrow (9/20).
---- Brian McAllister Senior Software Engineer mcallister@mit.edu Bates Research & Engineering Center (617) 253-9537 Middleton, MA
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:33 EST