Table of contents:

First Coil Delivery at Bates summer of 1999
(Warehouse 2)

BLAST Coils with sub-frames
Everson Electric Trip Reports and Pictures

Vacuum System for January 2000 run. Many components will be used in final BLAST vacuum system
Wire Chamber - Ideas Model File MF1,MF2 Zip file (Winzip7.0)
Library Data File of Blast Assy in Zip format (Winzip7.0)


Capable of delivering Hydrogen, Helium, Nitrogen, and Deuterium
At flows ranging from 1x10e16 to 5x10e18 atoms per second

Main Frame for BLAST in pit with drive mechanism for splitting (dark blue)
Last Updates: June 12, 1998