The hall will be open all day saturday and sunday. The first priority
is to establish good beam thorugh the downstream spin flipper which offers
a somehwat reduced aperture.
* After CCR is done with optimization (I0, lifetime) tune the slits
by looking at phys0 (elastic coincs), phys3 (front coincs), as well as
phys1, phys2 (L and R singles) on the scaler screen.
* Measure the rate with all slits out. Optimize the slit position with
empty target and with 0.2 SCCM H2. CCR controls the slit movements.
* After good beam or best-possible beam has been established we need to
take 0.2 SCCM runs to study if backgrounds are considerably different
* At the same time - with a Wch person on shift - we can run the
Wch, make sure the hall lights are off (I asked ccr, but check).
* We should finish the runplan of 11/14 as far as printng reference runs
(see cb, mailing archive and/or NM)
* On sunday we should update the situation. We should consider taking data
and measuring rates for more "generic" triggers to study possibly multiple
events in a sector. (our triggers so far have always been 1 event/sector
only)
-- ________________________________________________________________________________ Tancredi Botto, phone: +1-617-253-9204 mobile: +1-978-490-4124 research scientist MIT/Bates, 21 Manning Av Middleton MA, 01949 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST