From: Jason Seely (seely@MIT.EDU)
Date: Tue Dec 10 2002 - 05:23:51 EST


CCR worked on optimizing the beam all morning. eventually (~ 5 am) got
a stable 75 mA, but since the south hall is due to open at 7am (meaning
CCR will take the beam at 6:30), it was too late to get anything useful
done, so no runs were taken.

js