[BLAST_TOF] D-tunnel start up

From: Tancredi Botto (tancredi@mitlns.mit.edu)
Date: Fri Mar 28 2003 - 17:38:49 EST


Hello everybody:
this is a plea for help in the D-tunnel in preparation of the short
deadline for wch/abs tests with beam. This time everything has to be
perfect as there won't be much time to look back for problems and we
have a long long run ahead of us.

We need all available help. We have one week to maintain/fix the old
system and that is next week. The week after that we need time for a
number of upgrades (new hv, spin bits, lumi/moeller)

-- 
________________________________________________________________________________
Tancredi Botto,  		phone: +1-617-253-9204  mobile: +1-978-490-4124
research scientist		MIT/Bates, 21 Manning Av    Middleton MA, 01949
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^