[BLAST_SHIFTS] 06/09/03 C-shift

From: Baris Tonguc (baris@spinspin.lns.mit.edu)
Date: Tue Jun 10 2003 - 00:49:42 EDT


CCR worked on tuning the beam for higher current. HV crates were rebooted
physically at Dtunnel. Unpolarized Hydrogen flow was set to 0.1 sccm.
Wire chamber HV has been tripping quite often. Started to take data. Run
number 805 with lamda/2 out.

Baris
W.Xu (in absentia)
 



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST