[BLAST_SHIFTS] A shift 06/14/03

From: Adam DeGrush (degrush@mit.edu)
Date: Sat Jun 14 2003 - 07:48:32 EDT


12:40 Were notified by CCR of fire alarm-No one was injured.

1:24 Problems w/ transmitter 6. Technician called.

4:30: Problem Fixed.

4:39 Beam back. Continued running unpol hydrogen 0.05 sccm.
        WC: L1 tripped often, L16 tripped continuously. BQM's were ok,
turned off voltage to box 16.

6:15 Lost Connection to Crate L2 and L1. Cycled power.

Summary: Took Runs 896, 897,898, 899 with gain matched voltages for CC boxes
0 and 1.

Chi + Adam