[BLAST_SHIFTS] 03/06/27 C Shift Summary

From: Chris Crawford (chris2@lns.mit.edu)
Date: Sat Jun 28 2003 - 00:16:19 EDT


genya did work with the ion polarimeter the whole shift.
the beam was down for 1-2 hrs due to a problem with rf in the ring.

--chris, bill



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST