[BLAST_SHIFTS] 2003/06/28 C Shift Summary

From: Chris Crawford (chris2@lns.mit.edu)
Date: Sun Jun 29 2003 - 00:04:22 EDT


we took pol D data smoothly all night.
we had to reboot the roc's one down in the d-tunnel
the elog run gui started hanging when the done button was pressed
note: the abs flow was set at 60 sccm, but reads out at 24 sccm
  (due to some software calibration issue)

runs 1165-1175

--chris, wang



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST