[BLAST_SHIFTS] Shift summary

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Jul 21 2003 - 15:49:04 EDT


Operators: nikolas nikolas nikolas

Runs 1608-1613 are deemed invalid at the beginning of the shift since a fuse in the dtunnel tripped the transition units for the ABS.
Data taking continued until the DOE visit to the south hall. ( beam dumped at around 2:20pm). Data with tensor plus and minus taken in runs 1620-1624 and crunched.