[BLAST_SHIFTS] Shift summary

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Jul 22 2003 - 15:48:32 EDT


Operators: jrc nikolas ----

Shift started with Unpolarized data. We ran D2 at 0.1sccm for a few hours, took runs 1663-1668, then performed an SFT scan. Corrected the static field current to 11.0 as a result of the scan. Then took polarized D2 data at 60sccm.
Took runs: 1669-1673.
Flasher was turned on during run 1670. The scratch disk on dblast07 was filled by some time in the afternoon. After that an SFT scan was performed again.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST