Operators: chris2 ---- ----
16:00 hauke was working with the ABS
19:00 gave up and decided to run unpol D2
noticed that holding field was at 30 deg, CCR says it's a readout problem
spill monitors @50mA: u=219 d=79 l=143 r=56
compton laser off (door interlock tripped?)
sometime we need to go into the hall and shut the door! (not crutial for current studies)
21:00 had problem with beamgate. solved by rebooting coda
22:00 few trips of WC L6, just kept resetting (10 times)
good unpolarized runs (D2):
1694-1701, 1702-1710, 1712-1713
started crunching each of the runs