[BLAST_SHIFTS] Shift summary 08/01/2003 Owl

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Aug 01 2003 - 07:45:45 EDT


Operators: nikolas hauke nikolas

ABS scans of the MFT and WT for Hydrogen continued throughout the shift. First 4 hours dedicated to Blast field off measurements. Numerous scans performed and posted on the ABS website. After Hauke departed around 4am, the BLAST field was turned ON and scans repeated. Data is still being analyzed for conclusions. At 7:43am the spectrometer was ramped down to zero and then back up. Additional scans performed for consistency checks following the restoration of the field.