[BLAST_SHIFTS] Shift summary 08/17/2003 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Aug 17 2003 - 11:56:44 EDT


Operators: clasie tavi zhangchi

Tavi worked on the Cerenkov gain matching from 0800.

Beam came back from the 0750 transmitter crowbar at 0810. Then there was another crowbar at 0915 and beam came back around 1015. Polarized hydrogen runs 2032, 2036, 2037 and 2039 were taken. Wire chambers continued to trip, but were mostly ok. At 1150 R24 was lowered to 3700V as it tripped repeatedly.

lrn, flrn and charge.C are up to date.