[BLAST_SHIFTS] Shift summary 09/05/2003 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Sep 05 2003 - 16:06:15 EDT


Operators: tps tavi ----

We took data through the shift, despite the triping of WC R5 and L6.
Beam was off for 40 mins to try and let the chamber recover - without
much noticeable effect. We are now moving into an ion run.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST