[BLAST_SHIFTS] Shift summary 09/19/2003 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Sep 19 2003 - 15:47:30 EDT


Operators: tong degrush ----

We had south hall open for fixing drift chamber box and rewiring some LADs cable. Doug and Tong have checked R11 box and it is not tripping any more.
Adam and Tong have rewired LADs cable according to Karen's instruction.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST