Re: [BLAST_SHIFTS] Shift summary 09/30/2003 D (12-16)

From: John Calarco (jrc@einstein.unh.edu)
Date: Tue Sep 30 2003 - 15:50:05 EDT


Are the covers off the chambers?

On Tue, 30 Sep 2003, Electronic Log Book wrote:

> Operators: kdow seely zwart
>
>
> See previous shift report -- hall still open, solenoids are just about full, should be ok to run beam in about 2 hours. Detector subframes are closed now. RTOF0B problem has been found, being fixed.
>
> Plan is to run an hour or so of empty to compare with empty from before the collimator, then run H2 and D2 (all with physics.settings), see how collimator affects detector. Also will try singles.settings.
>
>
>
>

-- 