[BLAST_SHIFTS] Shift summary 09/30/2003 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Sep 30 2003 - 15:13:02 EDT


Operators: kdow seely zwart

See previous shift report -- hall still open, solenoids are just about full, should be ok to run beam in about 2 hours. Detector subframes are closed now. RTOF0B problem has been found, being fixed.

Plan is to run an hour or so of empty to compare with empty from before the collimator, then run H2 and D2 (all with physics.settings), see how collimator affects detector. Also will try singles.settings.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST