[BLAST_SHIFTS] Shift summary 10/01/2003 B (4-8)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Oct 01 2003 - 10:09:43 EDT


Operators: degrush nikolas kohlm

Took empty target data with colliminator in subdetector frame closed:

Runs are being crunched now since data transfer was prohibited due to spuds disk being full. Some commis data is being moved to free up space.

Runs Taken (Empty): 2963,2964,2966-2972.

Rates are higher than expected 500 hz/80mA- maybe due to beam hitting colluminator.

Plan is to now switch to unpol 0.1 sccm h2.