[BLAST_SHIFTS] Shift summary 10/01/2003 A (0-4)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Oct 01 2003 - 05:25:35 EDT


Operators: kohlm degrush ----

Beam came back by about 4am after the problems with transmitter 11 have been solved.

Beam tuning with BQM/slits done. Low BQM rates achieved (empty target).
However, physics event rate is already quite high (>500Hz at 70mA)
See extra elog entries for details.

Plan is to measure z distribution with empty target and then switch to H2 unpol during the morning hours.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST