Operators: seely tong ----
finished the vertical -1mm bump data taking. runs 3014-3017 are crunching as we speak.
switched to 0.1 sccm Hydrogen. CCR optimized the slits, and we began taking data. runs 3019-3020 are crunching now.
plan is to switch to deuterium at 20:00.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST