[BLAST_SHIFTS] Shift summary 10/02/2003 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Oct 02 2003 - 23:57:54 EDT


Operators: tong kohlm ----

We stopped H2 flow and start D2 flow.
Taking data since 8:40 with D2.
Run 3022-3026 has been lrn'd and charge'd.
We had problem with ROC and had to reset in D tunnel.
For some reason, override control was set and we had to set it off to give control to CCR.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST