[BLAST_SHIFTS] Shift summary 11/29/2003 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Nov 29 2003 - 13:06:05 EST


Operators: degrush ---- tsentalovich

CCR had gotten a later start (5:00 am) to beam tune due to vacuum problems.

Genya came in at 8:00 and set up ABS.

Access to the south hall was taken to close detector subframe. WC covers were left on as per Doug's suggestion.

ABS valve v14 was closed to allow CCR to tune with no gas flow to target to establish baseline for BQM's.

Ligit Pressure(No Gas): 1.25 x10-8



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST