[BLAST_SHIFTS] Shift summary 12/05/2003 A (0-4)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Dec 05 2003 - 04:23:31 EST


Operators: zhangchi clasie ----

This shift was mostly smooth polarized H data taking. Run numbers 3610-3617.

Doug noticed that there was no signal from wire chamber box L9. In the D-tunnel the cable to the TDC was unplugged. This was plugged back in at approx 23:55.

Data is being crunched and is very slow. The crunching of the data since 8pm is still in progress. So, runs have been Charge'd but there is no asymmetry to show yet.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST