[BLAST_SHIFTS] Shift summary 12/10/2003 A (0-4)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Dec 10 2003 - 04:10:41 EST


Operators: akdogan ajmasch ----

After recovering from the power failure, we started to take data. Calibration of the Compton took some time. The beam polarization measurements turned out to be zero. The problem was tracked down to a diabled fast-HV-swicth of the Compton pockel cell, and has been enabled (has been disabled by the powwer failure.) Thus, had no beam polarization measurements for the runs 3787-3791.

After recovering from this problem, everything seemd to be functioning within acceptable limits; smooth data taking.

New runs are being crunched...



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST