Operators: tavi karpiusp zhangchi
Minor problems with HV trips (LADS) but trip frequency was low enough that we did not need to adjust the voltage-
BLAST field tripped at one point but CCR cycled the hoding field and we reset the MFT.
See elog for points of bad polarization - this was not a consistent thing so we did not call Bill (runs for questionable polarization are 4129, 4131, 4135)
Had to reboot HV in D-tunnel at 2330, this took mutliple hard reboots but finally we are back in business
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST