[BLAST_SHIFTS] Shift summary 02/15/2004 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Feb 15 2004 - 11:53:32 EST


Operators: egeis shino ----

Took data 4751 and 4752. The ring magnet, CQ11, tripped and the cooling fan is fixed. But the beam has not available since 6:00 AM, because there is another problem at EPICS control in the control room. Our HV are set OFF and "saved" because sometimes ring fill switch and oper mode suddenly turned on. The next shift person has to turn the HV switchs on and "save" them.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST