[BLAST_SHIFTS] Shift summary 02/20/2004 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Feb 20 2004 - 12:14:12 EST


Operators: seely degrush ----

no data taken during this shift. still trying to resolve TS problem. TB is on his way in to try to fix it. see elog for details of botched attempts at recovering.

in the meantime, VZ is regenerating the ABS nozzle.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST