[BLAST_SHIFTS] Shift summary 02/23/2004 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Feb 23 2004 - 23:50:48 EST


Operators: adrian zhangchi shino

at 5pm, all 4 HV crates had to be power recyled.

L21 guard wire tripped and kept tripping, Doug gave instructions to recover that.

D2 data takiing, smooth. had to deal with some trippings like usual.

the two H2 runs after changing the timing coin window, show worse angular and vertex resolution, 1.5deg now. Doug had an email pointing out WC t0 shift.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST