Unfortunately, the runs taken with the flipper and fixed abs flipping
software are painfuly slow to crunch, so I'm unable to see if there is
an asymmetry and what it looks like. I suggest we keep running with the
flipper until we get confirmation one way or another on the asymmetry.

                                                                   
Cheers, Vitaliy

Electronic Log Book wrote:

>Operators: yxiao egeis ----
>
>5107 (good data) stopped prematurely due to trip with CCR. max oscillator? having problems and a power supply needed replacing. Finished at ~11:40. Used the time for Micheal to calibrate the timing in the LADS. Bill also needs about an hour with the beam to steer alignment with compton and spin flipper. Hopefully we'll resume running by ~3:30.
>
>I have been noticing a great deal of discussion involving the spin flipper... If all goes well and running resumes... Would we like to take two full 500k ABS D2 runs, one with flipper on, one with flipper off?
>
>
>
>