[BLAST_SHIFTS] Shift summary 03/18/2004 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Mar 19 2004 - 00:14:14 EST


Operators: egeis clasie yxiao

Runs 5691 5694-5697 taken... crunching has halted since the last 3 have not been transferred to the spuds... I may be at fault by accidently entering the command 'remove 1' (that would be me, eugene....) Hopefully, things will change so there is data ready for analysis come the morning...

I am happy to report, all WC L0-32 and R0-32 are running at nominal voltage 3850V. Beam injection was bumped up to 95 A at ~20:00.