Stopped taking data shortly after 7:00 to open the hall for the maintenance.
Several things are going on including Snake fill and regeneration of ABS nozzle.
Also efforts are being made to add steering capacity upstream and downstream of BLAST to compensate for the transverse holding field. The strength of LS31V, LS1V and LS3V will be increased by adding a second coil to each. An additional
steerer will also be placed between LS30 and LS31. Hall will remain open into the afternoon.