[BLAST_SHIFTS] Shift summary 03/30/2004 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Mar 30 2004 - 14:57:14 EST


Operators: kdow franklin akdogan

Hall was open for this shift. Superconducting solenoids filled. ABS nozzle has been warmed up, cooled back down.

Steering coils were being added between the Compton and the internal target to aid in tuning the beam to satisfy both.

Tavi found a bad HV cable for LCC1_T3. He asked that the voltage on that tube be kept at -2200V, rather than the old -2606V, until he's on shift tomorrow night.

Michael has been working on the neutron counter timing walk measurements.

Ben reconnected a BATs flasher cable (left sector, 2nd BATs), which involved removing the BATs from the detector subframe.

Karen installed the BATs TDC, and made one test of the XMLU verify problem (unsuccessful).



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST