[BLAST_SHIFTS] Shift summary 04/02/2004 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Apr 02 2004 - 15:51:24 EST


Operators: akdogan ---- ----

Other than about an hour interruption due to a power supply change,
we took production data smoothly.

L14 was slighly hot, causing trips more than usual. Had to lower the HV to
3775V. Since than only one L14 trip was observed. We can try to increase it
back to 3800V soon.

Runs taken:6181-6183
They are crunched or being crunched.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST