Operators: nikolas kohlm zwart
Shift again dominated by wire chamber trips.
Nik kept resetting boxes until 4am.
Turned chambers and beam off at 04:30, took cosmics for BAT.
After switching things back on, same problems come back.
Reduced voltages until trips became less, see elog 22343
Runs with cosmics for BAT: 6365-6370
Runs polH2: 6363 6374
MK
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST