[BLAST_SHIFTS] Shift summary 04/07/2004 B (4-8)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Apr 08 2004 - 08:33:38 EDT


Operators: nikolas kohlm zwart

Shift again dominated by wire chamber trips.
Nik kept resetting boxes until 4am.

Turned chambers and beam off at 04:30, took cosmics for BAT.
After switching things back on, same problems come back.
Reduced voltages until trips became less, see elog 22343

Runs with cosmics for BAT: 6365-6370
Runs polH2: 6363 6374

MK



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST