[BLAST_SHIFTS] Shift summary 04/09/2004 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Apr 09 2004 - 12:29:16 EDT


Operators: ---- ---- ----

L1 HV has raised to the nominal value.
L14 has tripping only once per run. Needs to get tested if it can hold 3800V.
CCR fixed the transmitter 5 around 10:30.
We have crunched data up to run 6391.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST