[BLAST_SHIFTS] Shift summary 04/16/2004 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Apr 16 2004 - 16:36:00 EDT


Operators: akdogan karpiusp ----

During the second half of 8-4pm shift period we had little data.

A brief power glitch happened at 10:27. The beam is restored relatively quickly
at 12:37. After having about 2 hours of data, we lost the beam again. During
the beam-off time, the IOC for spin flipper was booted which interfered the
holding field control later, which took another 2 hours to fix.

We got beam about an hour ago, and resumed data taking.

During the first half of the 8-4pm shift, we took data smoothly. They are all
crunched.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST