Operators: manouch shino ----
Polarized hydrogen data were taken with several HV trips at WCR24 sense and field, a few at WCL14 sense and LADS for last seven hours. Wire Chamber HV were kept 3,850 V except for L14 (3,800 V).
CCR stopped the beam for snake filling at 6:30 am as planned.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST