Operators: manouch shino ----
Polarized hydrogen data were taken and several HV trips occurred at WC R24 as well as a few for each WCL14 and LADS. WCHV were kept at 3,850 V except for L14 (3,800 V).
CCR stopped the beam at 6:30 am to fill snake as planned.